Boston PFC Approves Bridge Easements, Two Affordable Housing Extensions in January Session

BOSTON — January 11, 2023 — Boston Public Facilities Commission approves bridge easements and advances 37 affordable units in Dorchester. The commission, chaired by Catherine Craven, voted unanimously on three items at its January 11 meeting. Joseph Fiori of Boston Public Works and Brian Valancourt of AECOM presented four temporary construction easements at 226-234 Causeway Street and 1 Chelsea Street for the North Washington Street Bridge replacement, noting property values along the corridor have surged from roughly $100 to $270 per square foot since 2017, raising the combined easement value from $45,200 to $112,300. Traffic is scheduled to shift to the new bridge in December 2023, with full opening expected by end of 2024. The commission also approved an MOH request advancing a 15-unit affordable homeownership project at three city-owned sites, all restricted to buyers at or below 80 percent of AMI, and a 12-month extension of the developer designation for T. Lee Development LLC and Co. Everything LLC to build 22 condominiums and 1,500 square feet of ground-floor retail on Harvard and Standish streets in Dorchester, with all units capped at 90 percent AMI.

Keep reading with a 14-day free trial

Subscribe to The Boston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Boston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Suffolk County News · The Chelsea Post · The Revere Post · The Winthrop Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.