Boston Commission Clears Six Actions, Sets October Hearing for 300-Bed Cancer Hospital
BOSTON — September 25, 2025 — Boston's Public Improvement Commission approved six infrastructure petitions and advanced four development projects to public hearings on October 9 at its September 25 meeting. Chair Yasha Franklin-Hodge presided as the commission unanimously cleared discontinuances, projection licenses, and specific repairs tied to the completed 212 Stuart Street project in downtown Boston — a housekeeping exercise described by attorney Greg Samson of Solomon Worcester as resolving minor post-construction encroachments into the public way. The commission also approved specific repairs for Dinosaur Milk LLC at 31 Milk Street contingent on sign-off from the Commission for Persons with Disabilities, and granted Verizon New England a location for new conduit on Byrd Street, Columbia Road, and Cedar Place in Dorchester. The headline new business item was a first presentation by Beth Israel Lahey Health, Dana-Farber Cancer Institute, and Payette architecture on a proposed 300-bed, 450,000-square-foot cancer hospital at the Joslin Diabetes Center site in the Longwood Medical Area, requiring vertical discontinuances spanning Pilgrim Road and Brookline Avenue for two elevated hospital connectors; the team confirmed an appraisal has been submitted to city staff and will return for a public hearing October 9. A 363 East Street residential project in South Boston, at a construction standstill pending PIC approval, was also set for an October 9 hearing.
Keep reading with a 14-day free trial
Subscribe to The Boston MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news