Boston PIC Advances Seaport Street Overhaul, Copley Bus Stop Redesign to Public Hearing
BOSTON — March 14, 2024 — Boston's Public Improvement Commission advanced a Seaport streetscape overhaul and a Copley Square bus stop redesign to public hearings set for March 28. The commission heard first presentations on the city-initiated reconstruction of Congress Street, Sleeper Street, and A Street in Fort Point — the final piece of the Big Dig-era Crossroads Initiative — which would widen sidewalks to up to 17 feet, install two 7.5-foot separated cycle tracks, and replace all street lighting with Four Point District-style fixtures along roughly 900 feet of Congress Street alone; construction is not expected before spring 2025. The MBTA's Pete Roby told commissioners that the St. James Avenue and Trinity Place redesign would serve the ninth-busiest bus stop in the entire MBTA network, with a roughly 60 percent service increase planned in coming years. Fort Point Neighborhood Association member Tom Ready warned that the Congress Street project would eliminate all 15 resident-only parking spaces on A Street, a conflict the city has not yet formally resolved. The commission also unanimously approved a Verizon conduit installation at 660 Tremont Street and sidewalk repairs for GCB Realty LLC on Center Street and Greenview Avenue, while setting a March 28 hearing for a pedestrian easement tied to a 126-unit, 100-percent affordable building at 341 LaGrange Street in Chinatown.
Keep reading with a 14-day free trial
Subscribe to The Boston MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news